REMP considers the following standard installation assumptions. The company will always inform you if any extra cost may occur. If there are any extra costs involved, in your installation they will let you know how much they are and what they are for in your quote.
- Standard power cable up to 5 metres.
- Drilling holes and routing of the cable through up to one internal and one external wall.
- All necessary screws, dowel, work, not connections work for installation.
- Fitting and testing of electrical connections excluding circuit protection device.
- Installation of components to meet the latest wiring regulations, as required.
- No special civil or electrical work is included.
- Installation of CT clamps are included with the product.
- Earthing connections to existing earthing wire, additional earthing works are not in scope.
Key Areas; EV Charger, Electric Vehicle Charger, EV Charger Installation, Residential EV Chargers